Pre-1919 terraces and villas
Solid brick walls with no cavity, lime-based plaster, original floorboards and often a cellar. These houses reward a careful hand: sound joinery and plasterwork can be repaired and kept, rather than ripped out.
What to plan forWalls that need to breathe. Modern cement render or non-breathable paint trapped against old brick is a common cause of damp patches.
1930s semis
Good bones and generous rooms, but frequently with original wiring, a dated bathroom and a kitchen that has been patched over the years. A full refresh here often means new circuits, replastering and reworked layouts downstairs.
What to plan forTextured ceiling coatings from before 2000 can contain asbestos, so we check before anything is sanded or scraped.
Former rental and shared houses
Houses that have had years of tenants often need the lot: fire-damaged doors, worn flooring, tired bathrooms and walls that have been painted over rather than repaired. We return them to proper family homes.
What to plan forPartitions added over the years. Some can be removed, but others are holding something up, so we confirm before we cut.
Flats and maisonettes
Smaller spaces where every inch matters, so storage, lighting and layout get most of the thought. The work is detailed, with tight corridors and shared stairwells to protect.
What to plan forLeasehold flats usually need the freeholder's written consent, and many buildings restrict noisy work to set hours.