Skip to content

Bathroom installations built to stay watertight

A bathroom works hard every single day, and the part you never see decides how long it lasts. BA Construction strips out, waterproofs, tiles and fits bathrooms across Manchester, from a straight swap of the suite to a full walk-in shower room.

Finished interior from a BA Construction project
Quality fit-out completed by BA Construction
Renovation work by BA Construction in Manchester

Six signs the bathroom needs more than a fresh coat of sealant

Cosmetic fixes buy a few months. When the problem is behind the tiles or under the floor, a proper refit costs less than repeated repairs.

Black mould keeps coming back

If you wipe it off and it returns within weeks, moisture is getting in or the room is not extracting. New ventilation and waterproofing deal with the cause.

Tiles sound hollow or the floor gives

A soft floor around the bath or toilet usually means water has been reaching the boards for some time. It is better found at strip-out than after the ceiling below stains.

Grout and silicone fail every year

Constant re-sealing around the bath and shower tray is a sign of movement or poor waterproofing, not bad luck.

The layout works against you

A door that hits the basin, a bath that wastes half the room or a shower too cramped to turn around in. Moving fittings a few hundred millimetres can change the whole room.

Stepping into the bath is getting harder

A level-access shower with grab rails and a non-slip floor keeps the bathroom usable for years to come, and suits every age in the house.

Weak flow and noisy pipes

Low pressure, slow drains and hammering pipes are often fixed during a refit, when everything is exposed and can be replaced properly.

Pick the layout first, then the finishes that suit it

Older Manchester terraces and semis often have a small first-floor bathroom above the kitchen, while flats may have fixed pipe runs. We work with what you have and show you what is possible before you order anything.

Like-for-like refit

Best for a sound room that looks tired

New suite, tiles and fittings in the existing layout. The quickest route to a fresh bathroom, with minimal pipework changes.

Walk-in shower or wet room

Best for small rooms and easy access

Swaps the bath for a low-profile tray or a fully tanked floor with a linear drain. It opens up space and is simple to keep clean.

New en suite or cloakroom

Best for busy family homes

Carved from a landing, box room or under-stairs space. It needs a waste route and ventilation planned in from the start.

Full reconfiguration

Best when the current layout never worked

Relocated toilet, bath and basin, often with a new soil pipe route. More planning, and the biggest difference in daily use.

What goes into a bathroom that lasts

Waterproofing
Tanking boards or a waterproof membrane across shower walls and floors, with sealed joints and corners. This is the layer that protects the structure, long after the tiles are grouted.
Tiles
Porcelain or ceramic, from large-format wall panels with fewer grout lines to slip-resistant floor tiles. Fixed with flexible, water-resistant adhesive and grout.
Shower and glass
Toughened safety glass screens, low-profile trays, thermostatic valves and rainfall or standard heads, matched to your water pressure and system.
Suite and fittings
Close-coupled or wall-hung toilets with concealed cisterns, vanity units for storage, and heated towel rails on your existing system or electric.
Floor and ventilation
Moisture-resistant floor boards, optional electric underfloor heating mats, and a correctly sized extractor fan, ducted to outside.

One quote for every trade the bathroom needs

A refit involves plumbing, electrics, plastering and tiling in a strict order. We coordinate it all, so you have one point of contact from the first visit to the last clean.

  • Survey and itemised written quoteMeasured on site, with the specification set out clearly.
  • Layout and product guidanceHelp choosing a plan, suite and tiles that fit the room and your budget.
  • Strip-out and waste removalOld suite, tiles and boards taken out and taken away.
  • Pipework and wasteNew supply, isolation valves and correctly falling waste runs.
  • Floor repairs and boardingAny damaged joists or boards put right, then a solid new floor deck.
  • Tanking and waterproofingSealed wet areas before a single tile goes on.
  • Lighting, fan and electricsSealed downlights, extractor and shaver or heated-rail supplies to current wiring rules.
  • Plastering, tiling and groutingFlat walls, straight lines and tidy cuts around every fitting.
  • Suite, shower and screen fittingFitted level and sealed. Planning the next room? See our kitchen installations or a wider property renovation.
  • Protection, testing and clean-upFloors and stairs covered throughout, every joint pressure-tested and the room cleaned at handover.
Completed home project by BA Construction

Creating the space for a new bathroom? A home extension can build it in.

The order a bathroom is built in, and why it matters

Skip a step or do it out of sequence and the problems show up behind the finished tiles. This is the sequence we follow, so each stage is checked before it is covered up.

  1. Survey and quote

    We measure the room, check the pipes, floor and walls, and talk through how you use the bathroom. You get a written, itemised price.

  2. Choices and ordering

    Suite, tiles, screen and fittings are confirmed and ordered, so the job starts with everything on site rather than waiting on deliveries.

  3. Strip-out

    Everything comes out down to the structure. This is when hidden damp, rot or old pipework is found and discussed with you straight away.

  4. First fix and waterproofing

    New pipes, waste and cables go in, the floor is made good and wet areas are tanked, then left to cure as the products require.

  5. Tiling and second fix

    Walls and floors are tiled and grouted, then the suite, shower, screen, lights and fan are fitted and sealed.

  6. Testing and handover

    Every joint, valve and drain is checked under working pressure. We walk you round, show you the stopcock and isolation valves, and clean up.

The safety rules a bathroom has to meet

Water and electricity share a small room, so the rules are strict. We build to them as standard and explain anything that affects your job.

Electrical safety

Wiring in a bathroom falls under Part P of the Building Regulations and BS 7671. It sets which light fittings, fans and sockets are allowed in each zone around the bath and shower, their IP waterproof ratings and RCD protection.

Water Fittings Regulations

Plumbing must meet the Water Supply (Water Fittings) Regulations 1999, which protect the mains from backflow and contamination. Some changes, such as a new bathroom with unvented or major supply alterations, need notifying to the water supplier.

Ventilation and drainage

New or reworked bathrooms need adequate extraction (Approved Document F) and properly vented, falling waste pipes (Approved Document H). It keeps moisture and smells out of the house.

Gas appliances

If a combi boiler or other gas appliance has to be moved or altered as part of the refit, only a Gas Safe registered engineer can legally do that work.

Structure and leasehold

Cutting into floor joists or removing a wall needs structural care. In a flat, your lease may require written consent from the freeholder before work starts, particularly for changes to pipes or floors.

Keep your electrical certificate and product guarantees together. A buyer's solicitor will ask for them.

Before and after, from our own jobs

Two home refurbishments, shown as we found them and as we handed them back. Drag the handle across to compare.

After: Home refurb
Before: Home refurb
BeforeAfter
Home refurb
After: Home refurb
Before: Home refurb
BeforeAfter
Home refurb

Where the money goes in a bathroom refit

Two bathrooms of the same size can cost very differently. These are the choices and discoveries that make the difference.

  • Moving fittingsKeeping the toilet and bath where they are is cheaper than re-routing waste and soil pipes.
  • Shower typeA tanked wet room with a linear drain takes more labour than a standard tray and enclosure.
  • Tile choice and coverageLarge-format porcelain, patterned layouts and full-height tiling all add time and material.
  • Condition behind the wallsRotten boards, damaged joists or old pipework can only be priced properly once the room is stripped.
  • Suite and fittingsWall-hung toilets with frames, concealed valves and designer brassware sit at the top of the range.
  • Heating and electricsUnderfloor heating, heated mirrors and extra circuits mean more electrical work.
  • AccessUpper-floor flats, narrow stairs and limited parking affect how materials are carried in and waste taken out.

Simple habits that keep a new bathroom looking new

Most bathroom problems start slowly. A few minutes of care a month keeps the room dry, clean and trouble-free.

10 year guarantee

Our bathroom work comes with a 10 year guarantee. If something is not right, you call the same team that fitted it.

  • Respect the cure timeSealant and grout need time to set before they get wet. We tell you exactly how long to wait before the first shower.
  • Run the fan after every showerLeaving the extractor on for around twenty minutes clears steam before it settles on walls and ceilings.
  • Check the silicone twice a yearLook for gaps or lifting around the bath, tray and screen. Re-sealing early is quick and prevents leaks.
  • Clean gentlyAvoid abrasive pads and harsh bleach on glass, chrome and natural stone. A soft cloth and a mild cleaner are enough.
  • Know your isolation valvesWe show you where they are, so a dripping tap or a leak can be stopped without turning off the whole house.

Bathroom refit questions, answered

Do I need to move out while the bathroom is being fitted?

No. Most households stay at home. The bathroom is out of action while the work is underway, so we plan the stages with you and discuss options such as a temporary toilet or using another bathroom in the house. Where possible, the water is kept on to the rest of the property outside working hours.

Can you replace my bath with a walk-in shower?

Yes, it is one of the most common changes we make. We check the floor, the waste route and your water pressure, then fit either a low-profile tray or a fully tanked wet-room floor with a linear drain. The right choice depends on the room and the structure beneath it.

Will my bathroom refit need Building Regulations approval?

Not always, but some work does. New electrical circuits, changes to drainage, ventilation and any structural alteration are covered by the Building Regulations. We confirm what applies to your job at the survey and arrange any approvals and certificates.

What happens if you find damp or rot once the old bathroom is out?

We stop, show you what we have found and explain the repair options. Damaged boards or joists are put right before anything new is fitted, and any extra cost is agreed with you before the work goes ahead. Nothing is covered up.

Do I have to buy the suite and tiles through BA Construction?

No. We can guide you on products that suit your room and budget, or fit items you have already chosen. We check what you have bought against the layout before fitting, so that sizes, waste positions and fixings all work.

How long does a bathroom installation take?

It depends on the size of the room, the layout and the finishes. A like-for-like refit is quicker than a reconfigured room with a tanked shower, as waterproofing and adhesives need time to cure. We give you a realistic programme with your written quote.

Ready for a bathroom that is built properly?

Tell us about the room you have now and what you want from it. We will visit, measure up and send you a written quote.

0161 123456