Home extensions that add real space

More room for the kitchen table, the kids or the in-laws, without the cost and upheaval of moving. BA Construction designs, builds and finishes home extensions across Manchester, from a single-storey kitchen extension to a full two-storey addition.

Building work completed by BA Construction
Finished interior from a BA Construction project
Construction project by BA Construction in Manchester

Six signs your house has run out of room

An extension is worth pricing when the house no longer fits the way you live and moving would cost more in fees and compromise than building.

The kitchen is a corridor

There is nowhere for a table, so meals happen on laps and homework on the worktop. A rear or side-return extension opens the room up.

Everyone is on top of each other

Children sharing, a home office on the landing, no quiet room for anyone. Extra floor area fixes it at the root.

The layout is chopped up

Small, dark rooms and a poor link to the garden are common in older Manchester terraces and semis. Knocking through and building out changes how the house works.

Family is growing or moving in

A ground-floor bedroom and shower room for a relative, or a bigger family room for teenagers, are some of the most common reasons we build.

You love the street, not the house

Good neighbours, schools and a short commute are hard to replace. Extending lets you keep all of that.

Storage has taken over

If the garage, hallway and spare room are all full, built-in storage and utility space in the new layout pays for itself in daily use.

Choose the right type of extension, then the right materials

The shape of your plot, the roof of the existing house and how you want the new space to feel decide the design. These are the layouts we are asked for most.

Single-storey rear

Best for kitchen-diners and family rooms

The classic. Pushes the back of the house into the garden and usually gives the biggest gain for the least disruption upstairs.

Side return

Best for terraced and semi-detached homes

Fills the narrow alley beside the kitchen. Often combined with a rear extension to make a wide, light open-plan room.

Wraparound

Best for a complete ground-floor rethink

A side and rear extension in one build. More structure and more planning, but the most transformative result.

Double-storey

Best for adding bedrooms and bathrooms

Builds up as well as out, so you get extra ground-floor living space and new bedrooms from a single footprint.

Materials we specify

Walls
Insulated cavity walls in facing brick matched to the existing house, or render and timber cladding where you want a contrast. Blockwork inner leaf with insulation to meet current energy rules.
Roof
Flat roofs in GRP fibreglass, EPDM rubber or single-ply membrane with roof lights, or pitched roofs in tile or slate to tie in with the house.
Glazing
Aluminium bi-fold or sliding doors, fixed glass and roof lanterns for light. Double or triple glazed units with a thermal break.
Floors and heating
Insulated concrete slab with screed, ready for underfloor heating or extended radiators on your existing system.

What your quote covers, from first survey to final clean

A home extension is many trades in a set order. We run them as one project so you deal with one team, not a string of contractors.

  • Site survey and written quoteMeasured on site, with the spec written down.
  • Drawings and approvals guidancePlans, structural calculations and Building Regulations sign-off explained.
  • Groundworks and foundationsDug to the depth the ground and the drawings require.
  • Brickwork, steel and roofSupported openings, insulated walls and a weathertight roof.
  • Windows, doors and roof lightsFitted, sealed and tested before the interior starts.
  • Electrics, plumbing and heatingFirst and second fix, with the new room tied into your existing systems.
  • Insulation, plastering and screedSmooth, dry walls and floors ready for decorating.
  • Kitchen or bathroom fit-outOur own kitchen and bathroom installers can finish the room.
  • Site protection and daily tidyDust sheets, protected floors and a clean site every evening.
  • Final clean and handoverA walk round together and your certificates in one folder.
Completed home project by BA Construction

Thinking about going up instead of out? See loft conversions.

How the build runs, stage by stage

Every extension follows the same order, because each stage has to be right before the next one starts. We talk you through each stage as it comes.

  1. Survey and quote

    We measure up, discuss how you use the house and agree the spec. You get the price in writing.

  2. Design and approvals

    Drawings and structural calculations are prepared, and planning or Building Regulations applications are made where needed.

  3. Groundworks

    Footings are dug and inspected by Building Control before concrete goes in. Drains are diverted or protected.

  4. Walls, steel and roof

    Brickwork goes up, steel beams support the opened-up wall and the roof goes on. Then the extension is weathertight.

  5. First fix and finishing

    Electrics, plumbing and heating first, then insulation, plaster and screed, followed by second fix and decorating prep.

  6. Inspection and handover

    Final Building Control inspection, a snagging walk-round and a full clean before we hand the keys back to you.

Planning, Building Regulations and your neighbours

The rules depend on your property and your plans. We confirm what applies at survey, so there are no surprises halfway through.

Planning permission

Many single-storey rear extensions fall under permitted development, but there are limits on depth, height and materials. Flats, listed buildings, conservation areas and houses that have already been extended often need a full application.

Building Regulations

Almost every extension needs approval, whether or not it needs planning. It covers structure, fire safety, ventilation, drainage, electrics (Part P) and energy efficiency (Part L). Building Control inspects at key stages and issues a completion certificate.

Structural engineer

Where a wall is removed or a steel beam is needed, an engineer calculates the loads and specifies the beam size. We build exactly to that design.

Party Wall etc. Act 1996

If you build on or near a shared boundary, or dig foundations close to a neighbouring building, you may have to serve notice on the neighbours before work starts.

Building over drains

A shared drain or sewer under the footprint can need the water company's agreement. It is checked early, because it affects the foundation design.

Keep the completion certificate safe. Your solicitor will ask for it when you sell.

Finished work you can judge for yourself

Two recent home refurbishments, shown as they were on day one and as we left them. Drag the handle across to compare.

After: Home refurb
Before: Home refurb
BeforeAfter
Home refurb
After: Home refurb
Before: Home refurb
BeforeAfter
Home refurb

What decides the price of an extension

No two houses are the same, so we do not guess a figure. These are the things that move the price up or down.

  • Size and storeysFloor area and whether you build up as well as out are the biggest factors.
  • Ground conditionsClay, tree roots or made-up ground can mean deeper or wider foundations.
  • Roof designA simple flat roof costs less than a pitched roof that has to tie into the house.
  • Structural workWide openings need larger steel beams and more temporary support.
  • Glazing and finishLarge sliding doors, roof lanterns and brick matching are where specification shifts the budget.
  • Moving servicesRelocating a boiler, radiators or drains adds work behind the scenes.
  • Fit-out and feesKitchen, bathroom, flooring, design and Building Control fees are best planned from the start.

Looking after your new extension

A little care in the first year helps the new build settle and dry out properly.

10 year guarantee

Every extension comes with a written quote and a 10 year guarantee. If something is not right, you call the same team that built it.

  • Let it dry before you seal itNew plaster holds moisture. Use a thinned mist coat first and wait before fitting vinyl wallpaper or heavy paint.
  • Expect minor hairline cracksA new structure moves slightly as it dries and settles. Fine cracks at joints are normal and are filled when you redecorate.
  • Keep the roof outlets clearCheck flat-roof outlets and gutters for leaves a couple of times a year.
  • VentilateOpen windows and use the extractor while the building dries out, especially in winter.
  • Keep your paperworkFile the Building Regulations completion certificate, electrical certificate and drawings together.

Home extension questions, answered

Do I need planning permission for a home extension?

Not always. Many single-storey rear extensions can be built under permitted development, which sets limits on depth, height and materials. Flats, listed buildings, conservation areas and houses that have already been extended often need a full planning application. We check your property at the survey and tell you which route applies.

Will I need Building Regulations approval?

Yes, almost every extension does, even when planning permission is not needed. It covers structure, fire safety, drainage, ventilation, electrics and energy efficiency. Building Control inspects at key stages, such as foundations and the finished build, and issues a completion certificate at the end.

How long does an extension take to build?

It depends on size and complexity. Many single-storey extensions take roughly three to four months on site once approvals are in place, and double-storey or wraparound projects take longer. We set out a programme with your quote and tell you if anything affects it.

Can we stay in the house while the work is going on?

Most people do. We seal off the work area with dust protection and agree access and a temporary kitchen set-up in advance. The noisiest days are usually groundworks and when the existing wall is opened up, and we warn you before each.

Will the extension match the rest of the house?

It can. We source bricks to match your existing walls and match roof tiles and window styles where you want a seamless look. If you prefer a modern contrast, such as render, cladding or large glazed doors, we can design that instead.

Can BA Construction fit the kitchen or bathroom in the new space too?

Yes. We install kitchens and bathrooms as well as building extensions, so the new room can be finished by the same team without handing the job to another firm. Planning the layout early means the electrics and plumbing are put in the right places from the start.

Ready to plan your extension?

Tell us what you have in mind. We will come out, measure up and send you a written quote.